Dive Against Debris Data Submission
Tokong Timur
6 October, 2014
- Team Leader
- Ivan Foong
- Number of Participants
- 10
- Total Debris Collected
- 3 kgs (estimated)
Survey Information
- Location Name
- Tokong Timur
- Organization/Dive Centre
- Long Adventure Outdoor Sport
- City
- Kuala Dungun
- Country
- Malaysia
- Date
- 6 October, 2014
- Survey Duration
- 40 Minutes
- GPS Coordinates
- Latitude:
Longitude:
- Weather Conditions
- Survey Depth Range
- 16–18 meters
- Area Surveyed
- 120 m2
- Dominant Substrate
- coral
- Ecosystem
- rocky reef
- Wave Conditions
- Slight for waves 0.5 -1.25 meter high
Debris Items Collected
other materials collected | |
---|---|
Crown of thorns | 6 |